Charger reliability report: Netherlands, October 2026
Which charging networks report the most broken chargers? Every 15 minutes we record the live status that operators publish for every public charge point in the Netherlands and count how many are reported out of order. These are the operators' own status reports, not our tests.
Key findings
- On average 2.0% of the 183,561 public charge points with a known status in the Netherlands were reported out of order by their operators (9 snapshots, first look, 2 hours of data).
- DC fast-charging locations: 9.2% out of order; AC-only locations: 1.7%.
- Among the 36 networks with at least 200 charge points, Heijmans reported the lowest share of charge points out of order (0.1%) and DAEN Mobility the highest (18.8%); 2 more reported none out of order at all.
- DC fast charging (networks with 100+ charge points at DC locations): Fastned lowest (0.7%), IONITY highest (15.3%).
- Not ranked because their status data looks implausible: bp pulse, Lidl, Blink Charging, ERA Contour | TBI and others.
Share of charge points out of order, by network
Average over all snapshots; networks with at least 200 charge points with a known status (the 15 largest). Lower is better. Dashed line: Netherlands average 2.0%.
Ranking: all networks with 200+ charge points
Rank 1 = lowest share out of order. "DC" = locations with at least one DC fast charger, "AC" = AC-only locations. Charge point numbers are averages over the snapshots.
| # | Network | Charge points (known status) | Out of order (all) | DC locations | AC locations | Long-term broken locations |
|---|---|---|---|---|---|---|
| 1 | IP Charging no charge point reported out of order - some operators may not publish faults at all |
937 | 0.0% | - | 0.0% | n/a |
| 2 | e-VOLTT no charge point reported out of order - some operators may not publish faults at all |
576 | 0.0% | - | 0.0% | n/a |
| 3 | Heijmans | 741 | 0.1% | - | 0.1% | n/a |
| 4 | ChargePoint | 508 | 0.2% | - | 0.2% | n/a |
| 5 | Lanova Laadpalen | 349 | 0.3% | 1.3% (79) | 0.0% | n/a |
| 6 | StellaPower | 318 | 0.3% | - | 0.3% | n/a |
| 7 | Enviem | 317 | 0.3% | - | 0.3% | n/a |
| 8 | Pluq | 1,906 | 0.4% | 0.0% (29) | 0.4% | n/a |
| 9 | EQUANS | 24,698 | 0.6% | - | 0.6% | n/a |
| 10 | Q-Park | 1,812 | 0.6% | - | 0.6% | n/a |
| 11 | Den Hartog Charging | 556 | 0.6% | 0.0% (32) | 0.7% | n/a |
| 12 | Ubitricity | 3,678 | 0.6% | - | 0.6% | n/a |
| 13 | Fastned | 1,217 | 0.7% | 0.7% (1,217) | - | n/a |
| 14 | PowerGo | 250 | 0.8% | 1.0% (202) | 0.0% | n/a |
| 15 | Vattenfall InCharge | 43,773 | 1.0% | 1.3% (317) | 1.0% | n/a |
| 16 | 50five | 11,138 | 1.2% | - | 1.2% | n/a |
| 17 | TotalEnergies | 18,554 | 1.2% | 11.2% (180) | 1.1% | n/a |
| 18 | Qwello | 12,815 | 1.4% | - | 1.4% | n/a |
| 19 | Interparking | 369 | 1.4% | - | 1.4% | n/a |
| 20 | Shell Recharge | 764 | 1.4% | 1.5% (752) | 0.0% | n/a |
| 21 | Eneco | 6,374 | 1.5% | 2.6% (621) | 1.4% | n/a |
| 22 | Allego | 18,412 | 1.5% | 4.3% (541) | 1.4% | n/a |
| 23 | Greenchoice | 226 | 1.8% | - | 1.8% | n/a |
| 24 | Tesla | 927 | 1.8% | 1.8% (927) | - | n/a |
| 25 | Opcharge | 2,091 | 2.2% | - | 2.1% | n/a |
| 26 | We Drive Solar | 417 | 2.2% | - | 1.7% | n/a |
| 27 | Fleet Charge Services | 356 | 2.2% | - | 2.2% | n/a |
| 28 | Valk Energy | 556 | 2.3% | 2.0% (343) | 2.8% | n/a |
| 29 | Mick-E | 383 | 2.3% | - | 1.3% | n/a |
| 30 | E-Flux | 13,765 | 2.9% | 3.2% (621) | 2.9% | n/a |
| 31 | Spirii | 391 | 3.1% | 3.5% (345) | 0.0% | n/a |
| 32 | Tanx | 256 | 3.1% | 3.3% (123) | 3.0% | n/a |
| 33 | Mijninstallatiepartner | 237 | 3.8% | 7.4% (68) | 2.4% | n/a |
| 34 | Agrisnellaad | 209 | 7.2% | 20.9% (43) | 3.6% | n/a |
| 35 | Laadnet | 5,852 | 7.8% | 2.0% (51) | 7.9% | n/a |
| 36 | DAEN Mobility | 955 | 18.8% | - | 18.7% | n/a |
| Netherlands (all networks) | 183,561 | 2.0% | 9.2% | 1.7% | n/a |
Long-term broken (completely out of order for 7+ days in a row) needs at least 7 days of snapshots; it appears once enough data has been collected.
DC fast charging: lowest and highest out-of-order share
Networks with at least 100 charge points at DC fast-charging locations.
Lowest share out of order
- Fastned 0.7% (1,217 charge points)
- PowerGo 1.0% (202 charge points)
- Vattenfall InCharge 1.3% (317 charge points)
- Shell Recharge 1.5% (752 charge points)
- Tesla 1.8% (927 charge points)
Highest share out of order
- IONITY 15.3% (117 charge points)
- Tango electric 11.9% (126 charge points)
- TotalEnergies 11.2% (180 charge points)
- Electra 8.7% (126 charge points)
- T-Electric 8.6% (116 charge points)
Cities
By the city name in the source data.
| City | Charge points (known status) | Out of order (all) | DC locations | AC locations |
|---|---|---|---|---|
| Amsterdam | 6,902 | 2.8% | 21.8% | 1.9% |
| Rotterdam | 9,366 | 1.4% | 17.6% | 0.8% |
| The Hague | 8,447 | 3.9% | 2.5% | 3.9% |
| Utrecht | 4,177 | 1.4% | 27.8% | 0.8% |
| Eindhoven | 3,340 | 2.4% | 2.7% | 2.4% |
| Groningen | 1,832 | 2.2% | 6.6% | 2.0% |
Not ranked: status data looks unreliable
These networks publish a status that doesn't look like real-world use (for example almost every charge point "out of order", or never anything occupied or out of order). That is more likely a data issue than a fact about the chargers, so we don't rank them.
| Network | Charge points (known status) | Why not ranked |
|---|---|---|
| bp pulse | 421 | 81% reported out of order - status data looks unreliable, not ranked |
| Lidl | 208 | 92% reported out of order - status data looks unreliable, not ranked |
| Blink Charging | 199 | 73% reported out of order - status data looks unreliable, not ranked |
| ERA Contour | TBI | 58 | reports (almost) every charge point as available at all times - status looks static, not ranked |
| Klokgroep | 54 | reports (almost) every charge point as available at all times - status looks static, not ranked |
| Smart Grid Monitor | 35 | reports (almost) every charge point as available at all times - status looks static, not ranked |
| SPAR Holding | 24 | reports (almost) every charge point as available at all times - status looks static, not ranked |
| Valk Welding | 21 | reports (almost) every charge point as available at all times - status looks static, not ranked |
36 smaller networks (or networks without live status) are included in the country totals but not ranked.
Methodology
Source. NDW (Nationaal Dataportaal Wegverkeer) open charging data (CC0 1.0, source). Operators publish a live status per charge point; the feed is refreshed every 10 minutes and PlugCompass records a snapshot every 15 minutes.
- Charge point: one charging position that can serve one car at a time (an "EVSE"), as published by the operator.
- Out-of-order rate = charge points reported out of order ÷ charge points with a known status (available, occupied/charging or out of order), summed over all snapshots in the period. This is the average over snapshots, weighted by the number of charge points with a known status.
- Unknown status is left out of the calculation. 95% of charge points had a known status.
- DC vs AC: the feeds give status per location, so "DC" means locations with at least one DC fast charger (all charge points there, including any AC posts), and "AC" means AC-only locations.
- Ranked: networks with at least 200 charge points with a known status on average (DC table: at least 20 at DC locations; DC best/worst lists and headlines: at least 100). Operator names are normalised to one brand (for example legal-entity suffixes and site names removed).
- Data-quality check: a network reporting 50% or more of its charge points out of order, or practically never anything occupied or out of order, is flagged "status data looks unreliable" and not ranked.
- Long-term broken location: every charge point with a known status out of order in at least 90% of a day's snapshots, on 7 or more consecutive days.
- Period: UTC calendar month. Monthly figures are frozen when the month ends and never change afterwards; the current month is shown live.
Limitations. This is operator-reported status, not an independent test: a charger can report "available" and still fail to charge, and some operators may not report faults at all (a 0% share can mean that). Planned maintenance counts as out of order when the operator reports it so. Snapshots began on 2026-10-22; there is no earlier history. Numbers describe the data as published and are not a judgment on any company.
Embed or cite this report
Free to quote with a link. Suggested citation:
Embed the summary image:
More reports
Netherlands: October 2026
Finland: October 2026
France: October 2026
Norway: October 2026
Sweden: October 2026
How PlugCompass rates individual stations: How we score.
Last updated 23 Oct 2026, 00:53 UTC. Published by PlugCompass, Lissjos Engineering LLC. Source: NDW open data (CC0).